A proven process
Real projects
From site survey to operation — a transparent process and the installations SMARTGEN has completed.
Process
4 Professional Steps
1. Needs assessment
We analyze your electricity bill and usage pattern to propose a budget-fit concept.
2. Technical site survey
Our engineer checks roof area, sun orientation, and structural safety on-site.
3. Contract & paperwork
We finalize configuration, execute contract, and support required procedures.
4. Installation & handover
Safe installation, app setup, and operation guidance for immediate use.
Featured projects
Featured SMARTGEN completed projects.

Long Hau Industrial Park
Commercial ESS Project
Capacity
261.00 kWh
Monthly saving
-
“SMARTGEN is participating in a 261kWh-class commercial ESS project for a power consumption site in Long Hau Extended Industrial Park. The project aims to reduce peak load and optimize electricity usage, while SMARTGEN participates as a business partner supporting the project from the development stage through to the completion stage. Configuration: 1 unit of 261kWh-class Commercial ESS Application: Power Consumption Site in Long Hau Extended Industrial Par”

Hồ Chí Minh
SMARTGEN Mixed-use Facility Solar ESS Project
Capacity
6.82 kWp
Monthly saving
-
“SMARTGEN is developing a self-consumption energy system at its own mixed-use facility, where a café, workspace, and customer consultation area are operated together. The project consists of 11 PV modules, including 3 Trina Solar modules and 8 Longi Solar modules, combined with a 6kW hybrid inverter and a 10kWh LFP battery ESS. Configuration: Panel 6.82kWp + Hybrid Inverter 6kW + ESS 10kWh Application: SMARTGEN Mixed-use Facility”

Cao Lãnh, Đồng Tháp
Đồng Tháp
Capacity
5.00 kWp
Monthly saving
~1.8 Triệu
“PV : 5kWp, Inverter : 6kW, ESS : 5kWh”

Tân An, Long An
Vũ Long An Project
Capacity
5.58 kWp
Monthly saving
~1.8 Triệu
“Residential Solar ESS Project in Long An SMARTGEN installed a residential self-consumption energy system for a house in Long An, applying a 5.58kWp solar PV system, a 6kW hybrid inverter, and a 5kWh LFP battery ESS. Installation Period: March 20–21 Completion Date: March 21 Configuration: Panel 5.58kWp + Hybrid Inverter 6kW + ESS 5kWh”