A proven process
Real projects
From site survey to operation — a transparent process and the installations SMARTGEN has completed.
Process
4 Professional Steps
1. Needs assessment
We analyze your electricity bill and usage pattern to propose a budget-fit concept.
2. Technical site survey
Our engineer checks roof area, sun orientation, and structural safety on-site.
3. Contract & paperwork
We finalize configuration, execute contract, and support required procedures.
4. Installation & handover
Safe installation, app setup, and operation guidance for immediate use.
Featured projects
Featured SMARTGEN completed projects.

Long Hau Industrial Park
261kWh Commercial BESS — Long Hau Industrial Park
Capacity
261.00 kWh
Monthly saving
~29.5 Triệu
“SMARTGEN took part in a 261kWh-class commercial BESS project for a power consumption site in Long Hau Extended Industrial Park as the partner responsible for the BESS scope. The system entered operation in August 2026 and currently runs peak shaving aligned with the time-of-use (TOU) tariff. Configuration: 1 unit of 261kWh-class commercial BESS Application: Power consumption site in Long Hau Extended Industrial Park”

Hồ Chí Minh
SMARTGEN Mixed-use Facility Solar ESS Project
Capacity
6.82 kWp
Monthly saving
-
“SMARTGEN is developing a self-consumption energy system at its own mixed-use facility, where a café, workspace, and customer consultation area are operated together. The project consists of 11 PV modules, including 3 Trina Solar modules and 8 Longi Solar modules, combined with a 6kW hybrid inverter and a 10kWh LFP battery ESS. Configuration: Panel 6.82kWp + Hybrid Inverter 6kW + ESS 10kWh Application: SMARTGEN Mixed-use Facility”

Cao Lãnh, Đồng Tháp
Đồng Tháp
Capacity
5.00 kWp
Monthly saving
~1.8 Triệu
“PV : 5kWp, Inverter : 6kW, ESS : 5kWh”

Tân An, Long An
Vũ Long An Project
Capacity
5.58 kWp
Monthly saving
~1.8 Triệu
“Residential Solar ESS Project in Long An SMARTGEN installed a residential self-consumption energy system for a house in Long An, applying a 5.58kWp solar PV system, a 6kW hybrid inverter, and a 10kWh LFP battery ESS. Installation Period: March 20–21 Completion Date: March 21 Configuration: Panel 5.58kWp + Hybrid Inverter 6kW + ESS 10kWh”